1. Ensure all
scaffolding materials must be constructed and maintained in accordance with standards.
2. The Scaffold
frames must be of approved tubular steel construction.
3. Provide Hand
rails and toe boards on all scaffolds and it should be in good quality.
4. Ensure
the Scaffold planks must be at least 50 millimetres thick, and a maximum of 2
metres in length. Scaffold planks must extend past the frame support by 30
centimetres, and boards must be tied down, or otherwise secured to prevent
movement.
5. Provide
an access ladder, separate from the scaffold frame and it must be used & secured
to all scaffolds.
Safety Net Fall Protection Construction
6. No more
than 1.5 metres, is allowed between horizontal bracing (transoms), or ledgers.
7. Provide diagonal
supports are also on every other scaffold section.
8. Rolling
scaffolds may not exceed 3 times higher than the narrowest scaffold width.
9. Provide
wheels on the scaffolds and all scaffold wheels must be equipped with working
brakes, and brakes must be set while work is done on the scaffold.
10. Aware
all Employees, NOT allow to ride on rolling scaffolds while being moved.
11. Tubular
scaffold which exceed 10 meters in height by 6 metres in width must be secured
to the structure at 5 metres intervals. And if not possible provide Buttresses
of approved design.
Health Hazard – Blue | NFPA Hazard Diamond
12. All
scaffolds to be inspected by the competent person, Only GREEN tagged scaffold
can be used, no one is allowed on RED, YELLOW or without scaffolding tag.
13. Do not
erect, alter, or dismantle any part of scaffolds; this is the scaffolding competent
team scope. If it is required to modify a scaffold contact area scaffolding
foreman or chargehand to do it.
14. Only
approved scaffold, erected by competent persons must be used-barrels, boxes,
bricks, paint cans, and any other make shift platforms should not be used.
15. No
loose tools or material should be left on scaffolds or work platforms, especially
in the edge of the scaffold/platforms.
16. Train
all the employees - No material should be dropped or thrown from scaffold at
any height.
17. Always
barricade your area at the time of Erecting or Dismantling of the scaffolding.